Rs 926-crore six-lane tunnel project on Pune-Satara highway to be completed by 2023: Gadkari

The total capital cost for the 6.43 km long project is approximately Rs 926 crore and is expected to be completed by March 2023, it said.The minister said average travel time at Pune-Satara and Satara-Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes, respectively.

PTI| New Delhi | India

Updated: 06-07-2022 18:27 IST | Created: 06-07-2022 18:27 IST

Image Credit: ANI

The six-lane tunnel on the Pune-Satara highway being constructed at an estimated cost of Rs 926 crore is expected to be completed by March 2023, Union road transport and highways minister Nitin Gadkari said on Wednesday.

The new tunnel at Khambatki Ghat on National Highway-4 is a twin tunnel with three lanes each, the minister said, according to a transport ministry statement.

''He said the existing 'S' curve in the Satara-Pune direction shall be completed soon which would lead to a drastic reduction in accident risks. The total capital cost for the 6.43 km long project is approximately Rs 926 crore and is expected to be completed by March 2023,'' it said.

The minister said the average travel time at Pune-Satara and Satara-Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes, respectively. With the completion of this tunnel, the average travel time shall be reduced to 5-10 minutes.

The tunnel is going to enhance connectivity and, most importantly, provide direct benefits to commuters through their value over time and value over cost savings, Gadkari said.

(This story has not been edited by Devdiscourse staff and is auto-generated from a syndicated feed.)

READ MORE ON

Satara-PuneSataraNationalKhambatkiNitin GadkariGadkariKhambataki Ghat

READ MORE

OPINION / BLOG

LATEST NEWS

VIDEOS

View All