Breakthrough achieved for 4.88 km Shilpata-Ghansoli tunnel for Mumbai-Ahmedabad bullet train project.
- Country:
- India
Breakthrough achieved for 4.88 km Shilpata-Ghansoli tunnel for Mumbai-Ahmedabad bullet train project.
(This story has not been edited by Devdiscourse staff and is auto-generated from a syndicated feed.)
ALSO READ
Haryana's Expressway Boom: Transforming Connectivity by 2026
Star Air Expands Regional Connectivity with New Routes
Odisha's Highway Revamp: Boosting Connectivity and Development
Odisha's NH-326 Transformation: Boosting Connectivity
Greenfield Corridor to Redefine Maharashtra's Connectivity Landscape

