Swift Repairs: Resuming Operations at West Qurna 2

Repair work on the damaged pipeline at Lukoil's West Qurna 2 oil field in Iraq concluded on Monday. Full operations were anticipated to resume between 1 a.m. and 2 a.m. West Qurna 2 is notably one of the largest oil fields globally, contributing to 0.5% of the world’s oil production.

Swift Repairs: Resuming Operations at West Qurna 2
This image is AI-generated and does not depict any real-life event or location. It is a fictional representation created for illustrative purposes only.

The damaged pipeline at Lukoil's West Qurna 2 oil field in Iraq saw repair work completed by Monday evening, sources within the energy sector have confirmed to Reuters.

As a result, the resumption of full operations at the site was anticipated to occur between 1 a.m. and 2 a.m., reinstating its significant role in global oil production.

West Qurna 2 is renowned as one of the world's largest oil fields, accounting for approximately 0.5% of global oil output.

Give Feedback

Use this form for editorial or site feedback. We usually reply within 2 to 3 working days.

By submitting, you agree that we may use your email address to respond.