Electric Bus Incident Near Mumbai Metro Site Reveals Infrastructure Challenges
An electric bus belonging to the Brihanmumbai Electric Supply and Transport (BEST) got stuck in a pit caused by Metro construction in south Mumbai. No passengers were harmed. The incident highlights infrastructure issues, with authorities investigating the five-foot-deep pit's creation by ongoing Metro work.
- Country:
- India
An electric midi bus operated by the Brihanmumbai Electric Supply and Transport (BEST) found itself ensnared in a pit this Monday morning. The incident unfolded near a Metro construction site at Girgaon in Mumbai, officials disclosed.
Fortunately, no casualties were recorded as all passengers were evacuated safely. The rear of the vehicle sank into the pit, which resulted from partial road collapse near Dr Babasaheb Jaykar Marg at the Thakurdwar Metro Line 3 site. Construction work remains ongoing in the area.
Local residents suggested the pit, nearly five-foot deep, appeared due to ongoing Metro construction work. Both BEST and the Mumbai Metro Rail Corporation (MMRC) have initiated enquiries to explore concern over infrastructure stability.
(With inputs from agencies.)
- READ MORE ON:
- Mumbai
- Metro
- construction
- bus
- incident
- infrastructure
- BEST
- Girgaon
- MMRC
- transport
ALSO READ
Drone Incident Near French Carrier Raises Tensions
Railway's Swift Action: Scanners to Boost Safety Post-Fire Incident
Boosting Himachal Pradesh Tourism: CM Sukhu's Infrastructure Initiative
Medanta Tops India's Healthcare Chart: No. 1 in World's Best Hospitals 2026
Tragic Turn in Bhilwara: Father and Son Found Dead in Shocking Incident

