Turbulence in Kishtwar: Political Interference Threatens Ratle Hydroelectric Project
Harpal Singh, a senior officer from Megha Engineering and Infrastructure Limited, reports interruptions by BJP MLA Shagun Parihar in the Ratle Hydroelectric Power Project, Jammu and Kashmir. This meddling poses threats of major financial losses, legal penalties, and could compromise project safety and quality.
- Country:
- India
In a significant controversy, the construction of the 850-MW Ratle Hydroelectric Power Project in Kishtwar, Jammu and Kashmir, is facing challenges due to alleged political interference. Harpal Singh, Joint COO of Megha Engineering and Infrastructure Limited (MEIL), has described disruptions allegedly led by local BJP MLA Shagun Parihar.
MEIL, which has heavily invested in the venture, reports possible substantial financial losses and penalties if political meddling persists. Concerns are mounting over the project's safety and quality amid demands for contract awards and recruitment, leading to tensions between MEIL and local political figures.
The company, linked with NHPC Limited and JKSPDC for this project, emphasizes maintaining a neutral political stance. Singh has urged authorities to ensure the project's continuation without disruptions, warning of potential withdrawals. Video evidence of harassment incidents has intensified calls for governmental intervention and local community support.

