Successful Engine Trial Boosts Prospects for Beed-Wadwani Rail Line
An engine trial on the Beed-Wadwani rail line was successfully completed. Scheduled train trial runs are set for December. If high-speed trials succeed, regular services could begin soon, extending to Ahilyanagar.
- Country:
- India
On Sunday, a successful engine trial was conducted on the 30-kilometre Beed-Wadwani rail line, a significant step towards commencing regular train services.
An official announced that train trial runs are scheduled for December 10 and 11. Originally set for Saturday, the slow-speed engine trial commenced a day later at 12 noon from Beed, reaching Wadwani within an hour.
Should high-speed train trials prove successful, the much-anticipated regular services between Beed, Wadwani, and Ahilyanagar could commence shortly thereafter.
(With inputs from agencies.)
ALSO READ
Maharashtra Government Launches Emergency Helpline Amid Middle East Crisis
Asian Airlines Face Turbulence Amid Escalating Middle East Conflict
Deadline Extended for Indore Water Contamination Probe
Trump's Uncertain War: Shifting Aims and Timelines in Iran Conflict
Airlines Grapple with Oil Price Surge Amid Middle East Conflict

