First Glimpse: Robot to Retrieve Fuel Debris from Fukushima Reactor
Tokyo Electric Power Company Holdings will deploy a remote-controlled robot to retrieve melted fuel debris from Fukushima Daiichi's No. 2 reactor by October, marking the first such attempt since the 2011 meltdown. This effort is crucial for the plant's ongoing decommissioning, despite being years behind schedule.
- Country:
- Japan
The operator of Japan's destroyed Fukushima Daiichi nuclear power plant demonstrated Tuesday how a remote-controlled robot would retrieve tiny bits of melted fuel debris from one of three damaged reactors later this year for the first time since the 2011 meltdown.
Tokyo Electric Power Company Holdings plans to deploy a "telesco-style" extendable pipe robot into Fukushima Daiichi No. 2 reactor to test the removal of debris from its primary containment vessel by October.
That work is more than two years behind schedule. The removal of melted fuel was supposed to begin in late 2021 but has been plagued with delays, underscoring the difficulty of recovering from the magnitude 9.0 quake and tsunami in 2011.
During the demonstration at the Mitsubishi Heavy Industries' shipyard in Kobe, western Japan, where the robot has been developed, a device equipped with tongs slowly descended from the telescopic pipe to a heap of gravel and picked up a granule.
TEPCO plans to remove less than 3 grams of debris in the test at the Fukushima plant.
"We believe the upcoming test removal of fuel debris from Unit 2 is an extremely important step to steadily carry out future decommissioning work," said Yusuke Nakagawa, a TEPCO group manager for the fuel debris retrieval program. "It is important to proceed with the test removal safely and steadily." About 880 tonnes of highly radioactive melted nuclear fuel remain inside the three damaged reactors. Critics say the 30- to 40-year cleanup target set by the government and TEPCO for Fukushima Daiichi is overly optimistic. The damage in each reactor is different, and plans must accommodate their conditions.
Better understanding the melted fuel debris from inside the reactors is key to their decommissioning. TEPCO deployed four mini drones into the No. 1 reactor's primary containment vessel earlier this year to capture images from the areas where robots had not reached.
(This story has not been edited by Devdiscourse staff and is auto-generated from a syndicated feed.)
ALSO READ
We could also talk about cooperation in construction of small modular nuclear reactors and floating nuclear power plants: President Putin.
ECOVACS Launches the DEEBOT X11 OmniCyclone in India as Its Latest Premium Robotic Vacuum Cleaner
Pudu Robotics Unveils PUDU D5 Series: Industry-Grade Autonomous Quadruped Robots Designed for Complex, Real-World Operations
AI-driven microrobots transform disease detection and drug screening
Midwest isn’t ready for robots at work but isn’t afraid of losing jobs either

