Chandrayaan-3 launch scheduled for July 13: Officials

The launch of Chandrayaan-3 has been scheduled for July 13 at 230 pm, officials said on Wednesday.This is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface. The propulsion module will carry the lander and rover configuration till 100 km lunar orbit.

Chandrayaan-3 launch scheduled for July 13: Officials
  • Country:
  • India

The launch of Chandrayaan-3 has been scheduled for July 13 at 2:30 pm, officials said on Wednesday.

This is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface. It has a lander and rover configuration. Chandrayaan-3 will be launched by the Launch Vehicle Mark-III from the Satish Dhawan Space Centre in Sriharikota and this is scheduled for July 13 at 2:30 pm, according to the officials. The propulsion module will carry the lander and rover configuration till 100 km lunar orbit. It has a Spectro-Polarimetry of Habitable Planet Earth payload to study the spectral and polarimetric measurements of Earth from the lunar orbit.

Give Feedback

Use this form for editorial or site feedback. We usually reply within 2 to 3 working days.

By submitting, you agree that we may use your email address to respond.